News

  • TOP
  • News List
  • Official Operation of Ho Chi Minh City Metro Line 1: Looking back on NISHIO’s support from the initial stages of the project

2025/01/10

Official Operation of Ho Chi Minh City Metro Line 1: Looking back on NISHIO’s support from the initial stages of the project

()

On December 22, 2024, Ho Chi Minh City officially commenced operation of Metro Line 1 (Ben Thanh – Suoi Tien), marking a significant milestone in the development of a modern public transportation system in the city.

The Ho Chi Minh City Urban Railway Construction Project (Ho Chi Minh City Metro) is one of the first projects in Vietnam to use our equipment rental services (alongside the Hanoi Urban Railway Project). Throughout the journey of constructing and completing this metro line, NISHIO provided essential equipment that ensured the project’s progress and quality. We are proud to have been the equipment supplier from the construction phase to the project’s completion.

List of Equipment Provided by NISHIO for the Ho Chi Minh City Metro Project

Here are some images of the equipment NISHIO supplied for this National Key Project:

Image of NISHIO's Hand Roller at the HCMC Metro Line 1 construction site.

Hand Roller: Used for compacting soil and rocks during ground leveling, ensuring the stability of foundation layers.

Image of NISHIO's Generator at the HCMC Metro Line 1 construction site.

Generator: Provided a stable and continuous power supply for construction works, especially in areas far from main power sources.

Image of NISHIO's Air Compressor at the HCMC Metro Line 1 construction site.

Air Compressor: Supported tasks requiring compressed air, such as drilling, excavation, and other construction activities.

Image of NISHIO's Elevating Rolling Tower at the HCMC Metro Line 1 construction site.

Elevating Rolling Tower: Facilitated safe and efficient construction of station structures, elevated bridges, and other high-rise works.

Photo of NISHIO's Ride-on Scrubber in HCMC Metro

Ride-crubber: Ride-on Scrubber: Cleans inside the metro station.

Additionally, many other devices and machinery from NISHIO have been utilized in the construction of the HCMC Metro project, including:

  • Welding Machines: Used for welding, cutting, steel structure fabrication, and other construction stages.
  • Tamping Rammers: Compact soil or materials to enhance durability and stabilize the project’s foundation.
  • Cleaning Equipment: High-pressure washers are used for cleaning machinery, equipment, and construction areas, helping maintain a clean working environment. Shoe washing machines offer convenience for workers.
  • Cooling Equipment: Air jet fans assist in ventilating tunnels and enclosed spaces, improving air circulation, reducing heat, and dispersing exhaust gases. Mobile turbine fans provide powerful suction and airflow, aiding in toxic gas removal and improving air quality.

NISHIO’s Contribution to Project Progress and Quality

NISHIO’s equipment played a crucial role in assisting contractors to achieve the required progress and quality for Metro Line 1. The efficiency and durability of our equipment, combined with our professional support services, ensured the project proceeded smoothly and all construction milestones were completed on schedule.

We are committed to providing optimal equipment and solutions for major transportation projects, enhancing work efficiency, and ensuring the safety of workers and engineers throughout the construction process.

Continuing Collaboration with Future Projects

With the success of Metro Line 1, NISHIO will continue to accompany other public transportation projects in Ho Chi Minh City. Other Metro Lines are also expected to utilize equipment provided by NISHIO, ensuring uniformity and quality throughout the city’s metro system.

Commitment to Quality and Sustainable Development

With a long-term vision and commitment to delivering effective solutions, NISHIO will continue to provide equipment and support services for major future projects. We are proud to contribute to the sustainable development and modernization of Ho Chi Minh City’s public transportation system.


NISHIO – A Trusted Partner for National Construction and Transportation Projects.

 

 

  / 5. Vote count:

No votes so far! Be the first to rate this post.

Contact
HOTLINE: 025 1368 3224

Keywords

Related news

messenger